Hangar 97 | Bend, OR

Southwest Bend is getting a new gathering place. The Hangar — an aviation-inspired food cart pod, taphouse, and indoor pickleball facility — is coming to the corner of Murphy Road and SW Silverado Springs Drive on Lot 1 of Murphy Crossing Phase 1. Ridge Line Design is the civil engineer of record, supporting the project from land use entitlement through construction-ready site improvement plans.

Our site improvement plans cover a three-phase build-out: a 3,055-square-foot taphouse, the pickleball building, and a six-cart food pod with plazas, stairs, and retaining walls resolving roughly eight feet of grade. Stormwater infiltrates on-site through a sedimentation manhole and rock infiltration trench within a cross-lot drainage easement. Each food cart gets dedicated water, sanitary, gas, and electric connections, backed by grease interceptors, a duplex lift station, and force main to City sewer — with Roats Water District service, a private fire line, and 36 parking stalls including EV-ready and van-accessible spaces.

The Hangar builds on Ridge Line Design's ongoing work throughout Murphy Crossing, from land division and road widening to the neighboring RV resort and affordable housing.

Previous
Previous

City View Ph. 1 | Madras, OR